Cab Closure is Ready to Install
Jul/25/2019 Filed in: Phase II

We reassembled the cab closure and now it is ready to install.
Fitting Doors
Jul/20/2019 Filed in: Phase II

Started fitting the doors on the jeep in preparation for the putting the Cab Closure back on. New bolts will be cut and painted. We're waiting for the glass to be cut for the sides and rear windows.
Foam Insulation & Plasti Dip
Jul/11/2019 Filed in: Phase II

We put the foam insulation on the top. The Camo Plasti Dip really helped firm up the foam and made it a lot more durable.
Painting the Top
Jul/09/2019 Filed in: Phase II

After applying an adhesion promoter and aluminum primer it was time to put the Forest Green top coat on each part of the Cab Closure.
Cab Closure Paint Prep
Jul/05/2019 Filed in: Phase II

We took the Cab Closure apart in four pieces. The two sides, back and top. This will make it easier for prepping and painting. Some of the screws and bolts gave a pretty good fight, but eventually we got the all out.