We added a 60 gallon air compressor to the shop in preparation for the body work. That purchase turned out to be an excellent choice. Especially when it came time to paint the tub and body parts!
Phase II Restore
With the easy part behind us it' was time to start restoring or replacing parts. This took the longest time because each piece had to be cleaned, inspected, refurbished or replaced. It was fun to learn about each component and gratifying to see each part repaired and ready to install.
Click the Phase II link below and scroll to the bottom to see the progression.